Calpine Corporation – Garrison Energy Center Combined Cycle Power Plant

Location: Dover, DE

Matrix NAC was contracted by Calpine Corporation to build the Garrison Energy Center, a 309 MW combined cycle power plant in Dover, Delaware. Matrix NAC with its JV partner Parsons Brinkerhoff performed the lump-sum engineering, procurement, and construction (EPC) of this more than $150 million contracts. The plant employs highly efficient combined cycle technology with advanced environmental controls. Construction began in early 2013 and met it’s expected completion by June 2015.

390MW
combined cycle power plant
#150million
contract
100%
commitment to safety

Scope of Work

  • 150+ million contract
  • 390MW combined cycle power plant
  • Utilizes highly efficient technology with advanced environmental controls
  • Fulfilled the engineering, procurement, and construction (EPC)

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.

Doug Montalbano
Phone: 610 245 5635
Email: douglas.montalbano@matrixnac.com

Please select an option from the drop down to see the contact information.

Please select an option from the drop down to see the contact information.

return to top icontop